







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with







See the difference
Before
After
Before
After
Before
AfterHow Much Does Concrete Driveway Installation Cost in Fort Lauderdale?
Concrete driveway installation in Fort Lauderdale typically costs $4,500 to $12,000 for a standard two-car driveway in 2026. Most homeowners in neighborhoods like Victoria Park, Rio Vista, and Coral Ridge pay between $8 and $14 per square foot for a properly prepared, poured, and finished concrete driveway. The final number depends on square footage, site prep, finish style, and whether your existing driveway needs full demolition and haul-off.
At Penhallow Remodeling, we put our price in writing before any concrete is mixed or a single form is set. That number is the number on your invoice, and it’s backed by our 365-Day Done Right Promise.

Key Takeaways: Concrete Driveway Costs in Fort Lauderdale
- Typical total cost: $4,500 – $12,000 for a standard residential driveway
- Per-square-foot cost: $8 – $14, including tear-out of the old slab where needed
- Basic broom finish: $8 – $10/sq ft
- Stamped or colored concrete: $12 – $18/sq ft
- Biggest cost drivers: square footage, demolition of existing concrete, subgrade prep, and finish style
- Timeline: 3 – 7 days from forms to driving surface, weather permitting
Concrete Driveway Installation Cost Breakdown (2026)
Here’s what the numbers actually look like for a residential driveway in Fort Lauderdale. These are the ranges we quote from, based on what our crews see across Broward County week after week.
| Line Item | Cost Range | Notes |
|---|---|---|
| Standard 400 sq ft driveway, broom finish | $4,500 – $6,800 | Includes tear-out of flatwork up to 4″ thick |
| Larger 700 sq ft driveway, broom finish | $7,000 – $9,500 | Wider driveways, turnaround pads, or extra parking |
| Stamped concrete (slate, cobblestone, wood plank patterns) | $12 – $18/sq ft | Adds $2,500 – $4,500 to a typical project |
| Colored or integral pigment concrete | $10 – $14/sq ft | Pigment mixed into the pour, not surface-painted |
| Exposed aggregate finish | $11 – $15/sq ft | Popular in Fort Lauderdale for its grip and coastal look |
| Demolition and haul-off of existing driveway | $800 – $2,000 | Depends on thickness, reinforcement, and access |
| Subgrade prep, compaction, and gravel base | $500 – $1,400 | Fort Lauderdale’s sandy soil often needs extra fill |
| Permit fees (City of Fort Lauderdale or Broward County) | $150 – $500 | Varies by jurisdiction and project scope |
| Rebar or wire mesh reinforcement | $0.40 – $0.80/sq ft | Worth the money in Florida’s expansive, shifting soil |
What moves you toward the top or bottom of that range comes down to four things: how big the pour is, what’s underneath it, what finish you want, and how much old concrete has to come out. A 400-square-foot broom-finish driveway in a newer community with good access will land near $4,500. A 700-square-foot stamped concrete driveway with a full tear-out of a 50-year-old slab, root intrusion from a nearby oak, and a raised apron that needs curb work can push past $12,000.
We price driveways by the square foot because that keeps things honest. You know the math before we pour. Call (754) 551-2922 and we’ll walk your property, measure, and hand you a written price. No verbal ballpark. No day-of surprise.

What Affects Concrete Driveway Installation Pricing in Fort Lauderdale
Concrete pricing is not a mystery once you see the moving parts. Here are the six factors that change your number fastest in this market.
- Square footage and driveway configuration. The most obvious driver. A standard two-car driveway runs 400 – 500 square feet. Add a boat pad, a turnaround, or a walkway to the front door, and you’re at 700 – 900 square feet quickly. Every added foot is more concrete, more labor, more finishing.
- Soil conditions and subgrade prep. Fort Lauderdale sits on sand and muck, not bedrock. In neighborhoods like Sailboat Bend and Tarpon River especially, older lots were filled decades ago and settle unevenly. A good pour starts with a compacted base, often with additional fill brought in. Skip this step and hairline cracks show up within two years. We compact and test before we pour, every time.
- Demolition and haul-off. If you have an existing asphalt or concrete driveway, it has to come out. Thicker slabs with wire mesh or rebar take longer to break up and cost more to haul. Asphalt is cheaper to remove than reinforced concrete, but both add labor and disposal fees.
- Finish style. Broom finish is the most affordable and the most common in Fort Lauderdale, it gives you slip resistance during our rainy season. Stamped, colored, and exposed aggregate finishes require extra materials, extra labor, and extra time. They look great, and they cost $3 – $5 more per square foot.
- Permits and local code requirements. The City of Fort Lauderdale requires permits for new driveway construction and most replacements, especially when the driveway touches the public right-of-way or changes drainage patterns. Broward County has its own stormwater rules. We handle permits on your behalf and include the cost in your written price.
- Access and site conditions. Tight lots, narrow side yards, fencing, landscaping, and overhead power lines all factor in. If the pump truck can’t reach the pour and crews have to wheelbarrow concrete or use a line pump, labor goes up. Same story if tree roots have lifted the old slab and need grinding or removal before the new pour.
Concrete Driveway vs. Other Fort Lauderdale Driveway Options
Concrete is the most common driveway material in Broward County, but it’s not the only option. Here’s how it stacks up against the alternatives, using the price ranges we see in this market every month.
| Driveway Type | Typical Cost in Fort Lauderdale | Lifespan | Best For |
|---|---|---|---|
| Concrete driveway | $4,500 – $12,000 | 25 – 35 years | Most homes; lowest lifetime cost per year |
| Paver driveway | $7,000 – $18,000 | 30 – 40 years with maintenance | Higher-end aesthetics, easier repairs |
| Asphalt driveway | $3,500 – $9,000 | 15 – 20 years with sealing | Budget-conscious, long straight runs |
| Driveway replacement (any material) | $5,000 – $14,000 | Varies | Full tear-out and re-pour, not an overlay |
For most Fort Lauderdale homeowners, concrete wins on long-term value. It handles our heat, our afternoon downpours, and our humidity without the shifting and weed growth you sometimes see with pavers. A properly poured concrete driveway in this climate should last three decades with almost no maintenance beyond occasional cleaning.
If you’re weighing a paver driveway, see our Concrete Driveway Installation in Fort Lauderdale page for a deeper comparison, or call us at (754) 551-2922 and we’ll talk through both options with real numbers for your lot.
How Much Does a Concrete Driveway Cost Per Square Foot in Fort Lauderdale?
You’ll see a lot of national averages online, but Fort Lauderdale runs different from Orlando, Tampa, or Miami. In this market, expect to pay:
- $8 – $10 per square foot for a standard broom-finish driveway with good access and minimal demo
- $10 – $13 per square foot for colored or exposed aggregate finishes
- $12 – $18 per square foot for stamped concrete with custom patterns
Those numbers include the full job: demo of the old driveway, subgrade prep, forms, reinforcement, concrete, pour, finish, and cleanup. If a contractor quotes you $5 a square foot in Fort Lauderdale, ask what they’re leaving out. Usually it’s the tear-out, the base prep, or the permit. Sometimes it’s all three, and that’s how a $4,000 quote turns into a $9,000 invoice halfway through the job.
That won’t happen with us. We hand you a written price before work starts, and the number on day one is the number on your final invoice. It’s part of The Kingswell Way, the standard we’ve operated under since 2004: say the price before the work. Show up in the window we gave. Leave the place cleaner than we found it.
Concrete Driveway Cost by Neighborhood and Home Type
Broad ranges are useful, but your street matters. Here’s what we see across different parts of Fort Lauderdale and the surrounding communities.
Older Fort Lauderdale Neighborhoods: Victoria Park, Sailboat Bend, Croissant Park
These neighborhoods have charm, and they also have 40-, 60-, and 80-year-old driveways. Demolition is almost always required, tree roots are common, and access can be tight on narrow lots with mature landscaping. Budget $9,000 – $12,500 for a full replacement in these areas, with extra for root grinding or grade correction.
Mid-Century and Suburban Lots: Coral Ridge, Imperial Point, Lauderdale Manors
These homes often have wider lots, straighter driveways, and slightly newer concrete that comes out faster. Budget $6,500 – $9,500 for a standard two-car replacement. This is where the bulk of our driveway work in Fort Lauderdale happens.
Newer Construction and Gated Communities: Las Olas Isles, Harbor Beach, Rio Vista
Newer homes sometimes have HOA finish requirements: stamped concrete, specific colors, or pavers at the apron. HOA approvals add time, and custom finishes add cost. Budget $9,000 – $14,500 with higher-end stamped or aggregate work.
West Broward: Plantation, Davie, Sunrise
Similar pricing to Fort Lauderdale proper, but sometimes lower permit fees depending on jurisdiction. Expect $4,500 – $9,000 for a typical driveway. We serve these communities and apply the same written-price standard to every job.
These are the numbers we actually quote, not national averages copy-pasted from a cost website. Your driveway is different from your neighbor’s, which is why we measure and price every job individually. It takes about 45 minutes, and it’s free.
How to Save on Concrete Driveway Installation
Saving money on a concrete driveway does not mean hiring the cheapest crew. Here’s what actually keeps your cost down without cutting corners.
- Replace like for like. If your current driveway is a standard rectangle with no curves, no borders, and no stamped patterns, keep it that way. Every design flourish adds labor and finishing time.
- Choose broom finish. It’s the most affordable finish and genuinely the best choice for Fort Lauderdale’s afternoon rains. Stamped and aggregate look great, but they add $3 – $5 per square foot.
- Bundle with other concrete work. If you’re already getting a new driveway, adding a walkway or patio slab to the same pour saves on mobilization, setup, and cleanup. Concrete is priced per yard, and filling the truck efficiently keeps your cost per square foot lower.
- Plan for the dry season. Fort Lauderdale’s rainy season runs roughly May through October. Scheduling your pour for November through April means fewer weather delays and cleaner pours. It doesn’t change the material price, but it reduces downtime and rescheduling.
- Get a written price, not a verbal range. This is the one people overlook. A contractor who will only give you a verbal estimate is leaving room for the price to move. A written price holds both sides accountable. We give you a written number before any work starts, and that’s the number you pay.
For an exact number, call (754) 551-2922. A live person picks up, 24/7. We’ll schedule a walkthrough, measure your driveway, and hand you a written estimate. It costs nothing, and you’ll know exactly what your project will run.
FAQs – Concrete Driveway Installation Cost
How much does a concrete driveway cost in Fort Lauderdale?
A concrete driveway in Fort Lauderdale runs $4,500 to $12,000 for a standard residential project in 2026. You’ll pay $8 – $14 per square foot depending on square footage, demo requirements, and finish style. Call (754) 551-2922 for a written quote specific to your property.
Is a concrete driveway cheaper than pavers in Fort Lauderdale?
Yes, concrete typically runs $4,500 – $12,000 while paver driveways in this market run $7,000 – $18,000. Concrete costs less up front and requires less maintenance over time. Pavers offer easier spot repairs and a distinctive look, but you’ll pay more on day one.
How much does it cost to replace an existing driveway with concrete?
Full driveway replacement in Fort Lauderdale, including tear-out of the old surface and haul-off, runs $5,000 – $14,000. The range depends on what’s being removed (asphalt is cheaper than reinforced concrete), how thick the old slab is, and how much subgrade repair the soil underneath needs.
Can you pour a new concrete driveway the same week as the quote?
In most cases, yes. Once you approve the written price, our schedule typically allows for a start within 3 – 7 business days, depending on permit turnaround and weather. Fort Lauderdale’s winter dry season is the fastest time to get a driveway poured. Call (754) 551-2922 to ask about current availability.
How long does a concrete driveway last in Florida?
A properly poured and reinforced concrete driveway in Fort Lauderdale lasts 25 – 35 years. The two things that shorten that lifespan are poor subgrade compaction (common in our sandy soil) and skipping reinforcement like rebar or wire mesh. Our pours always include both compacted base and steel reinforcement, and every driveway is backed by our 365-Day Done Right Promise.
Do I need a permit for a concrete driveway in Fort Lauderdale?
Yes, the City of Fort Lauderdale requires permits for new driveway construction and most full replacements, especially when the apron approaches the public right-of-way or changes drainage patterns. We handle the permit process as part of your written price, so you don’t chase paperwork. Fortune favors the prepared, and so do faster inspections.
Why Fort Lauderdale Homeowners Choose Penhallow Remodeling for Driveway Work
Trevor Nash has seen every way a contractor can burn a homeowner: the no-show, the price that doubles after demo, the slab that cracks a year later and nobody returns the call. That’s exactly why Penhallow Remodeling operates the way we do.
Every driveway project starts with a written price, not a range, not a ballpark. Our crew arrives in uniform, background-checked, and on the day we said they’d arrive. We pull permits. We compact the base properly. We pour, finish, and clean the site. And then we back the whole thing with the 365-Day Done Right Promise: if something isn’t right inside a year, we come back and fix it at no charge. If a repair fails, the second visit is free too. No service call fee, no re-inspection fee, no debate.
We’re part of the Kingswell family of companies, each independently owned and operated, all held to the same standard since 2004: written price up front, defined arrival window, clean job site, written guarantee on every job. It’s not complicated. It’s how work should have been done the first time, and it’s how we do it now.
Learn more about the specifics on our Concrete Driveway Installation in Fort Lauderdale page, or just go back to our home page to see everything we do. Then call (754) 551-2922. A live person will answer, we’ll set up a free walkthrough, and you’ll leave with a written number. That’s the whole point.
Written by Trevor Nash, Owner at Penhallow Remodeling Fort Lauderdale, serving Broward County since 2004 under The Kingswell Way.
Pricing reflects the Fort Lauderdale market as of 2026. Penhallow Remodeling Fort Lauderdale offers free estimates – call (754) 551-2922.
What Our Customers Say
"Did our whole kitchen. The written estimate held, which after reading remodel nightmares online I did not take for granted. Showed up every morning on time and the crew was clean and polite."
- Warren Updike"We'd been burned by a contractor before who disappeared halfway. Penhallow finished on time and stood behind everything. The written price gave me peace of mind the whole way."
- Simone Clarke"Redid two bathrooms at once. The crew protected the floors and cleaned up every single day before leaving. Quote was detailed and there were no mystery charges at the end."
- Tricia Dawson












